Dick Henderson Bridge: Nitro, West Virginia

Thirty-eight 9-5/8” diameter micropiles, averaging 53 feet deep in rock at each of two piers to upgrade the foundations for the replacement of the Dick Henderson Bridge for the West Virginia Div. of Highways. The micropiles were installed through the water from a work deck on the coffer cells approximately 35 feet above the top of the riverbed. Grout placement for the micropiles was required to be by pressure grouting through the top of the micropile pipe that was 35 feet below the work deck.

Pittsburgh Office Location

Howard Concrete Pumping Pittsburgh PA Office

701 Millers Run Road
Cuddy, PA 15031
412.257.1800

CLICK FOR MAP

Cleveland Office Location

Howard Concrete Pumping Cleveland Ohio Office

18801 South Miles Rd.
Warrensville Heights, Ohio 44128
216.579.1855

CLICK FOR MAP

Illinois Office Location

Howard Concrete Pumping Illinois Office

124 Tower Plaza
Belleville, IL 62220
618.277.7510

CLICK FOR MAP

© Howard Concrete Pumping. All Rights Reserved - Howard Concrete Pumping Co., Inc. is an Equal Opportunity Employer
Site Map | LOG IN

Created by Blancteam.com

Scroll to Top