Project Showcase
Tough problems and site conditions
call for innovative solutions.
From pumping concrete nearly 900 feet vertically to stabilizing highways and power plants, we have solved many tough problems with ease.

Click here to view our Project Showcase
Innovations by Howard
  • One of the largest foundation slab mat pours ever undertaken in the United States—16,222 yards placed in 51 hours by 4 boom pumps.

  • 10,000 yard continuous slip form pour of three ash storage silos that lasted ten continuous days, non stop.

  • Howard produced, pumped and tremied over 80,000 yards to stabilize a major interstate highway interchange without any interruption
    in highway traffic.

  • Howard has pumped concrete nearly 900 feet vertically up a skyscraper, and also horizontally 2000 feet.
  • OUTRIGGER SPREAD AND LOAD
    All dimensions and weights are approximate.

    TYPE
    BOOM
    FRONT
    outrigger
    REAR
    outrigger
    FRONT
    to REAR
    MAX. FRONT
    outrigger Load
    MAX. REAR
    outrigger Load
    MAX. outrigger soil
    FRONT/REAR
    KVM 17 11'-9" 7'-2" 14'-5" 16,860 LBS. 11,240 LBS. 136-30 PSI/73-20 PSI
    KVM 32XL 19'-6" 17'-0" 24'-6" 32,600 LBS. 27,000 LBS. 166-57 PSI/138-47 PSI
    KVM 34X 20'-5" 18'-9" 23'-7" 39,500 LBS. 31,500 LBS. 201-69 PSI/161-55 PSI
    KVM 39X 25'-7" 21'-0" 29'-11" 42,000 LBS. 35,200 LBS. 182-73 PSI/162-61 PSI
    S 28X-4 19' 7" 11' 10" 21' 7" 28,500 LBS. 22,800 LBS. 206-49 PSI/165-40 PSI
    S 31 EZ 20' 5" 16' 10" 24' 5" 39,700 LBS. 30, 900 LBS. 203-69 PSI/158-54 PSI
    S 45 SX 27'-3" 27'-3" 29' 0" 58,500 LBS. 56,200 LBS. 362-102 PSI/348-98 PSI
    S 47 SX 27'-3" 27'-3" 29' 0" 58,500 LBS. 56,200 LBS. 362-102 PSI/348-98 PSI
    S 52 SX RZ5 29' 2" 33' 11" 35' 3" 75,308 LBS. 78,680 LBS. 151-04 PSI/157-04 PSI
    S 58SX 29'-2" 41'-1" 37'-9" 78,680 LBS. 83,176 LBS. 157-51 PSI/166-54 PSI
    back to Pump Specifications


    KVM17 | KVM32XL | KVM34X | KVM39X | KVM39 Detatch | S 28X-4 | S 31 EZ | S 45 SX | S 47 SX
    S 52 SX RZ5 | S 58 SX | S 61 SX | BPL 4000 | Outrigger Spreads & Loads | TeleBelt Conveyor 105
    TeleBelt Conveyor 110


    With Howard Concrete Pumping, our customers finish first every time!