Innovations by Howard
  • One of the largest foundation slab mat pours ever undertaken in the United States—16,222 yards placed in 51 hours by 4 boom pumps.

  • 10,000 yard continuous slip form pour of three ash storage silos that lasted ten continuous days, non stop.

  • Howard produced, pumped and tremied over 80,000 yards to stabilize a major interstate highway interchange without any interruption
    in highway traffic.

  • Howard has pumped concrete nearly 900 feet vertically up a skyscraper, and also horizontally 2000 feet.
  • Project Showcase
    We've handled a lot of tough jobs. From pumping concrete nearly 900 feet vertically up a skyscraper, to pumping it 800 feet down into a mine, we at Howard have taken on these jobs, and finished them with out hassle. Time-tested dependability continues to make us the top choice.

    Here is some of our best work.


    Duke Energy IGCC, Edwardsport, Indiana
    Howard Concrete Pumping: The Cleveland Clinic Services Used: Mine Grouting

    One of the largest mine grouting projects recently completed in the United States with nearly 149,000 cubic yards of grout manufactured and placed by Howard Concrete Pumping.

    Howard Concrete Pumping supplied numerous batch plants, drills, and concrete pumps for the project, which was completed in just 6 months!

    Back to top



    The Cleveland Clinic
    Services Used: Concrete Pumping

    Howard Concrete Pumping: The Cleveland Clinic At the Cleveland Clinic, a recent addition, which combines a 227,000 square foot underground facility with an 8-story aboveground parking garage, has given us at Howard an opportunity to display our unmatched versatility and reliability in concrete pumping. For a single pour in May 2007, our four units pumped more than 500 cubic yards per hour with ease. In four pours alone, we pumped more than 15,000 cubic yards.

    As most contractors know, projects of this size present many challenges, including a demanding schedule with little room for error. The concrete pumping solutions proposed by our team of professionals has been a key factor in keeping this project ahead of schedule.

    Back to top
    Limestone Storage Silo Foundation: Harrison Power Station, Shinnston, West Virginia
    Services Used: Concrete Pumping, Mine Grouting, Geotechnical

    Howard Concrete Pumping: Harrison Power Station A record-breaking mat pour - one of the largest ever undertaken in the United States - called for Howard crews to pump 16,200 yards of concrete over an area of more than an acre. It was completed, non-stop in just 51 hours—without a hitch!

    A serious problem developed when sink holes began to occur in this power plant switch yard. Working in extremely tight conditions and close to 500,000 volt power lines, we used trailer mounted equipment to pump over 20,000 yards of concrete into abandoned mines under the switch yard. We were also called on to do the same in a nearby
    ash disposal site. Howard Concrete Pumping: Harrison Power Station

    Our crews also placed flowable fill for a series of 200 ft. diameter foundations for thickener tanks and maintained a 15-degree slope angle (±1/2") across the entire foundation of each tank in the process. A flowable fill formulation was used for the foundation of a 1,000 ft. stack and in areas around concrete tunnels..

    Back to top
    I-79/1-279 Interchange: Pittsburgh, Pennsylvania
    Services Used: Mine Grouting

    Howard Concrete Pumping: I-79/I-279 Interchange An emergency situation developed when this heavily traveled intersection began to settle due to mine subsidence. A "fast track" solution was developed when Howard crews, working around the clock, over a weekend, stabilized the area, again without ever taking the road out of service.

    Back to top

    Rock and Roll Hall of Fame: Cleveland, Ohio
    Services Used: Concrete Pumping

    Howard Concrete Pumping: Rock and Roll Hall of Fame Two underwater tremie pours, totaling 2,000 cubic yards were included in the 15,000 cubic yards of concrete, placed by Howard Concrete Pumping at the Rock and Roll Hall of Fame building. The exposed concrete met the strict appearance standards demanded by world-renowned architect I.M. Pei, the designer of the structure

    Back to top

    I-77/I-70 Interchange: Cambridge, Ohio
    Services Used: Mine Grouting

    Howard Concrete Pumping: I-77/I-70 Interchange Over 80,000 cubic yards of concrete, produced in our own on-site batch plant, and pumped over a 5-month period, stabilized both the roadbed and the structures at this highway interchange, one of the largest in the interstate system. Our crews erected the batch plant adjacent to the highway and pumped to the bore hole accessing the mine. Special couplings, proper pump and concrete line sizes all contributed to a trouble-free job…and the highway was never out of service.